FEATURED PROJECTS
SM Bay Arena, Manila
The SM Bay Arena is expected to be the venue of choice for sporting events, concerts and entertainment shows in Manila. It has a seating capacity of 20,000 and is expected to open in 2012.
BF Metal’s scope in this project is the supply, fabrication and erection of the roof framing comprising 3,200 tons of steelwork.
Bissa Gold Project, Burkina Faso, West Africa
The Bissa Gold Project is a development mineral project located in Burkina Faso, West Africa and is owned by Jilbey Burkina SARL (“Jilbey Burkina”) a wholly owned subsidiary of High River Gold Mines Ltd. (“High River”). High River is evaluating the feasibility of an open pit mine project targeting several near surface gold deposits delineated on this project.
BF Metal’s scope in this project is the supply of labor, materials, tools, equipment and consumables for the fabrication of plate works in accordance to client’s furnished drawings and specifications.
-
SM Bay Arena
SM Prime Holdings Inc.
Pasay City, Philippines
Supply, fabrication and erection of roof framing comprising of 3200 tons of steelwork
-
Philippine National Railways (PNR) Truss Type Bridges
JH Pajara, RU Aquino, Prismodial & RCDG Construction Consortium
Laguna & Bicol, Philippines
Fabrication and pre-assembly of 30m (1 unit) & 50m (5 units) truss type bridges
-
Siana Gold Project
Greenstone Resources
Surigao Del Norte, Philippines
Fabrication of acid wash column and elution column (pressure vessel) including rubber lining
-
Siana Gold Project
Greenstone Resources
Surigao Del Norte, Philippines
Fabrication of power station building and stack structures
-
Structural Steel Works for Commonwealth Flyover and Congressional Avenue Pedestrian Overpasses
IM Construction Corp.
Quezon City, Philippines
Fabrication, delivery and installation of 60m & 68m long pedestrian overpasses
-
Surveillance Towers
Cambridge Communication Systems
Zamboanga, Philippines
Complete fabrication and pre-assembly of 20m, 25m & 30m high towers
-
Manhattan Parkways Tower 1,2 & 3
Megaworld Corp.
Quezon City, Philippines
Fabrication, delivery and installation of structural steelworks
-
Robinsons Galleria Skywalk
Robinsons Land Corp.
Pasig City, Philippines
Fabrication, delivery and installation of steel structures
-
Tobacco Paper Mill
Schweitzer-Mauduit RTL Phils. Inc.
Batangas, Philippines
Design, supply, fabrication and installation of 59 units of stainless steel tanks of various sizes
-
Tobacco Paper Mill
Schweitzer-Mauduit RTL Phils. Inc.
Batangas, Philippines
Fabrication, delivery and installation of tunnel dryer steel framing, walkways and handrails
-
Barge Hopper and Conveyor System
Crewtech Ship Management Phils., Inc.
Zambales, Philippines
Fabrication and erection
-
Q-Plaza Commercial Center
MQ Holdings
Marikina City, Philippines
Renovation, fabrication and erection of roof framing
-
SM Marikina Elevated Walkway
SM Prime Holdings Inc
Marikina City, Philippines
Fabrication, delivery and installation of steel structures
-
Sabang Steel Bridge
FF Cruz & Company Inc.
Batangas, Philippines
Fabrication of a 60m×8m×7m bridge
-
Didipio Gold Project – Feedwell & Bridge Assembly
Outotec Pty. Ltd.
Nueva Vizcaya, Philippines
Fabrication of 12m & 20m diameter thickener/feedwell tank
-
SM City Marikina Mall
SM Prime Holdings Inc.
Marikina City, Philippines
Fabrication and erection of structural steelworks for a 28000 sqm area
-
Gateway Mall
Araneta Center Development Corp
Quezon City, Philippines
Fabrication and erection of structural steel framings
-
SM Mall of Asia
SM Prime Holdings Inc.
Pasay City, Philippines
Fabrication and erection of structural steel framings
-
Structural Steel for Bridgeway
Central Bank of the Philippines
Quezon City, Philippines
Fabrication and erection of bridgeway for the transition tower and receiving area
-
Cash & Carry Additional Call Center Offices
Cash & Carry Mall
Makati City, Philippines
Fabrication and erection of 1000 tons of structural steelwork
-
Trinoma Mall
Ayala Triangle North of Manila
Quezon City, Philippines
Supply, fabrication and erection of structural steel framings
-
Tramo Left Turning Fly-Over
Department of Public Works & Highways Foundation Specialist
Pasay City, Philippines
Fabrication and erection of built-up girders
-
Apo Cement Plant
FF Cruz & Company Inc.
Cebu, Philippines
Total structural steelworks of 16,500 tons including fabrication, hot-dipped galvanizing and erection of a 1.2km structural steel conveyor and a 120 high pre-heater tower
-
Rufino Tower
First Pacific Reality & Development Corp.
Makati City, Philippines
Fabrication and erection of structural steel
-
26m High Compression Thickener
Outotec Pty. Ltd., Australia
Papua New Guinea
Supply, fabrication and delivery
-
28m Tailings High Rate Thickener
Outotec Pty. Ltd., Australia
Solomon Islands
Supply, fabrication, delivery and installation
-
Boseto Copper Dry Plant
Sedgman Metals, Australia
Botswana
Fabrication of 500 tons of structural steelwork
-
Boseto Copper Wet Plant
Sedgman Metals, Australia
Botswana
Fabrication of 500 tons of structural steelwork
-
CIL & Detox Top of Tank Structural Steel
GR Engineering Services, Australia
Solomon Islands
Supply, fabrication and delivery of CIL tanks platform steelwork
-
Gold Ridge Tanks
GR Engineering Services, Australia
Solomon Islands
Supply, fabrication, delivery and assembly of CIL and miscellaneous tanks
-
Simberi Gold
Allied Gold Ltd., Australia
Papua New Guinea
Supply, fabrication and surface treatment of 2 leach tanks, launders and distribution box
-
Technip Q-Chemical Factory
Technip, USA
Qatar
Hydrogen Reformer fabrication and galvanizing comprising of 2000 tons of steelwork
-
Gas Precipitator / Panel
Nippon Air Fin Corp., Japan
Japan
Fabrication of gas precipitator panels for a power plant
-
Methanol Steam Reformer
Technip, USA
Brunei
Fabrication of 2500 tons of steelwork
-
Okinawa Power Plant
Mitsubishi Heavy Ind. Ltd., Japan
Japan
Fabrication of power plant cooling system air duct
-
Steam Reformer Gas Duct / Panel
Kinetics Technology, USA
Sinagpore
Fabrication of gas duct / panel of steam reformer for radiant sections